Concrete Estimator
Concrete Estimator
Structure
Concrete Take-off: Foundations & Slab
From large scale commercial to residential townhouses, standalone new builds & renovations.
Quantities are measured from your project drawings for slabs, footings, thickenings, beams, pads and steps - returned as a clean schedule that's ready to price.
When drawings change, we can also re-measure and provide a change summary (what increased/decreased) to support any variation submissions.
Email your plans and we’ll confirm a fixed fee and turnaround timeframes today.
From large scale commercial to residential townhouses, standalone new builds & renovations.
Quantities are measured from your project drawings for slabs, footings, thickenings, beams, pads and steps - returned as a clean schedule that's ready to price.
When drawings change, we can also re-measure and provide a change summary (what increased/decreased) to support any variation submissions.
Email your plans and we’ll confirm a fixed fee and turnaround timeframes today.
Work Smarter
Not Harder
Pricing Drawings
Send through the Architectural & Structural documentation sets along with the Specification & any NTT's received to date.




CostX Measurement
Drawings are loaded into CostX for manual take-off. We follow ANZSMM 2022 best practices while measuring.
Detailed Take-off
Scope is measured in depth and presented in a logical manner, with any site specific preliminary items such as travel, access, inductions etc isolated above.




Pricing (Optional)
Only for those wanting to include pricing services plus take-off.
Detailed Take-off
Receive a hard copy of the final scheduled quantities as a baseline to refer back to in the likely event of future variations.




Excel Book
Receive the soft copy workbook of the final quantities that acts as a valuable tool for progress claims and pricing if you choose to keep pricing in-house.
Scope Report
We issue a covering letter that includes the final PDF measure, documents the take-off is based on, plus any noteworthy tags or clarifications.




Pricing Drawings
Send through the Architectural & Structural documentation sets along with the Specification & any NTT's received to date.


CostX Measurement
Drawings are loaded into CostX for manual take-off. We follow ANZSMM 2022 best practices while measuring.


Detailed Take-off
Scope is measured in depth and presented in a logical manner, with any site specific preliminary items such as travel, access, inductions etc isolated above.


Detailed Take-off
Receive a hard copy of the final scheduled quantities as a baseline to refer back to in the likely event of future variations.


Excel Workbook
Receive the soft copy workbook of the final quantities that acts as a valuable tool for progress claims and pricing if you choose to keep pricing in-house.


Scope Report
We issue a covering letter that includes the final PDF measure, documents the take-off is based on, plus any noteworthy tags or clarifications.


Pricing (Optional)
Only for those wanting to include pricing services plus take-off.
Work Smarter
Not Harder
FAQ
What do you need to complete a concrete take-off (slabs and foundations)?
The latest PDF drawings (foundation plan, floor/slab plan, details/sections), specification notes, and the current revision list. If available, send any engineer’s notes.
Do you break quantities down for different mixes or structural requirements?
Yes. Where drawings/specs show different concrete types or zones, we separate the concrete take-off by element/type so builders and subcontractors can apply the right rates.
What concrete elements are included in your slab and footing take-offs?
We measure concrete quantities for slabs, footings, beams, pads, thickened edges, steps and set-downs, plus openings/penetrations where shown—issued as a clear schedule ready for pricing.
Can you re-measure if the drawings change and show what increased or decreased?
Yes. We can complete a revised concrete take-off and provide an additions/omissions summary, making re-pricing faster and supporting cost changes/variations.
What do you need to complete a concrete take-off (slabs and foundations)?
The latest PDF drawings (foundation plan, floor/slab plan, details/sections), specification notes, and the current revision list. If available, send any engineer’s notes.
Do you break quantities down for different mixes or structural requirements?
Yes. Where drawings/specs show different concrete types or zones, we separate the concrete take-off by element/type so builders and subcontractors can apply the right rates.
What concrete elements are included in your slab and footing take-offs?
We measure concrete quantities for slabs, footings, beams, pads, thickened edges, steps and set-downs, plus openings/penetrations where shown—issued as a clear schedule ready for pricing.
Can you re-measure if the drawings change and show what increased or decreased?
Yes. We can complete a revised concrete take-off and provide an additions/omissions summary, making re-pricing faster and supporting cost changes/variations.
What do you need to complete a concrete take-off (slabs and foundations)?
The latest PDF drawings (foundation plan, floor/slab plan, details/sections), specification notes, and the current revision list. If available, send any engineer’s notes.
Do you break quantities down for different mixes or structural requirements?
Yes. Where drawings/specs show different concrete types or zones, we separate the concrete take-off by element/type so builders and subcontractors can apply the right rates.
What concrete elements are included in your slab and footing take-offs?
We measure concrete quantities for slabs, footings, beams, pads, thickened edges, steps and set-downs, plus openings/penetrations where shown—issued as a clear schedule ready for pricing.
Can you re-measure if the drawings change and show what increased or decreased?
Yes. We can complete a revised concrete take-off and provide an additions/omissions summary, making re-pricing faster and supporting cost changes/variations.
