Feasibility Estimates

Services

Clearer costs. Fewer surprises.

Clearer costs.
Fewer surprises.


Early cost budgets from Concept Drawings or sketches. We benchmark rates from similar builds to assemble an elemental estimate that includes allowances and any risks so you know if the project stacks up before committing to further Documentation or the Consent process.


We measure directly from your drawings to return a concise elemental estimate with covering letter that includes any significant notes and assumptions picked up along the way.


Email your plans and we’ll confirm a fixed fee and turnaround timeframes today.


Early cost budgets from Concept Drawings or sketches. We benchmark rates from similar builds to assemble an elemental estimate that includes allowances and any risks so you know if the project stacks up before committing to further Documentation or the Consent process.


We measure directly from your drawings to return a concise elemental estimate with covering letter that includes any significant notes and assumptions picked up along the way.


Email your plans and we’ll confirm a fixed fee and turnaround timeframes today.

Initial Estimate
Design Feasibility

Custom PDF graphic icons with outlook icon by SubsQS Ltd
Custom PDF graphic icons with outlook icon by SubsQS Ltd
  1. Concept Drawings

Provide Concept Drawings with any other relevant information that may impact on project cost.

Concept Estimate CostX Screenshot by SubsQS Ltd
Concept Estimate CostX Screenshot by SubsQS Ltd
  1. Detailed Measure

Drawings are loaded into CostX for detailed takeoff. Quantities are then manually measured with benchmark rates applied.

Concept Stage estimate report by SubsQS Ltd
Concept Stage estimate report by SubsQS Ltd
  1. Detailed Estimate

We provide you with the Elemental Estimate which shows the GFA (Gross Floor Area m2), plus a breakdown of costs within each element.

Computer generated icon showing yellow folder with white paper files by SubsQS
Computer generated icon showing yellow folder with white paper files by SubsQS
  1. Summary Letter

Included is a summary covering letter with assumptions. We also suggest likely build timeframes and depending on when you wish to commence building, an allowance for cost escalation.

White Character with SubsQS Logo and tick or cross
White Character with SubsQS Logo and tick or cross
  1. Decision Time

Can you proceed, or is it back to the drawing board? Our estimate can also serve as a tool to assist the re-design process if the Architects Design currently exceeds your budget.

Initial Estimate
Design Feasibility

  1. Concept Drawings

Provide your Concept Drawings with any other requirements or relevant information that may have an impact on project cost.

Custom PDF graphic icons with outlook icon by SubsQS Ltd
Custom PDF graphic icons with outlook icon by SubsQS Ltd
Concept Estimate CostX Screenshot by SubsQS Ltd
Concept Estimate CostX Screenshot by SubsQS Ltd
Concept Estimate CostX Screenshot by SubsQS Ltd
  1. Detailed Measure

Drawings are loaded into CostX so the take-off can commence. Quantities are then manually measured with rates applied.

  1. Detailed Estimate

We provide you with the Elemental Estimate which shows the GFA (Gross Floor Area m2), plus a breakdown of costs within each element.

Concept Stage estimate report by SubsQS Ltd
Concept Stage estimate report by SubsQS Ltd
Computer generated icon showing yellow folder with white paper files by SubsQS
Computer generated icon showing yellow folder with white paper files by SubsQS
  1. Summary Letter

Included is a summary covering letter with assumptions. We also suggest likely build timeframes and depending on when you wish to commence building, an allowance for cost escalation.

  1. Decision Time

Can you proceed, or is it back to the drawing board? Our estimate can also serve as a tool to assist the re-design process if the Architects Design currently exceeds your budget.

White Character with SubsQS Logo and tick or cross
White Character with SubsQS Logo and tick or cross

FAQ

How accurate are construction feasibility estimates?

Our feasibility estimates follow RICS standards for an 'order of cost' estimate. By using benchmark data from similar NZ construction projects, we ensure that as long as the project scope remains consistent, the initial budget remains a reliable guide for the design phase.

What is a Design Contingency in a QS report?

A Design Contingency is an essential allowance that absorbs costs arising from details released during the documentation lifecycle. It covers coordination gaps between disciplines and minor scope adjustments required during the building consent process.

Can I use a feasibility estimate for bank finance?

Yes. A professional Feasibility Estimate is a critical tool for construction finance. It helps financiers determine borrowing capacity and project viability before you commit significant capital to full architectural documentation and consenting.

What is the cost and turnaround time for a feasibility estimate?

For a single standalone residential dwelling, feasibility estimates start from $900+GST with a typical turnaround time of 3-5 working days.

How accurate are construction feasibility estimates?

Our feasibility estimates follow RICS standards for an 'order of cost' estimate. By using benchmark data from similar NZ construction projects, we ensure that as long as the project scope remains consistent, the initial budget remains a reliable guide for the design phase.

What is a Design Contingency in a QS report?

A Design Contingency is an essential allowance that absorbs costs arising from details released during the documentation lifecycle. It covers coordination gaps between disciplines and minor scope adjustments required during the building consent process.

Can I use a feasibility estimate for bank finance?

Yes. A professional Feasibility Estimate is a critical tool for construction finance. It helps financiers determine borrowing capacity and project viability before you commit significant capital to full architectural documentation and consenting.

What is the cost and turnaround time for a feasibility estimate?

For a single standalone residential dwelling, feasibility estimates start from $900+GST with a typical turnaround time of 3-5 working days.

How accurate are construction feasibility estimates?

Our feasibility estimates follow RICS standards for an 'order of cost' estimate. By using benchmark data from similar NZ construction projects, we ensure that as long as the project scope remains consistent, the initial budget remains a reliable guide for the design phase.

What is a Design Contingency in a QS report?

A Design Contingency is an essential allowance that absorbs costs arising from details released during the documentation lifecycle. It covers coordination gaps between disciplines and minor scope adjustments required during the building consent process.

Can I use a feasibility estimate for bank finance?

Yes. A professional Feasibility Estimate is a critical tool for construction finance. It helps financiers determine borrowing capacity and project viability before you commit significant capital to full architectural documentation and consenting.

What is the cost and turnaround time for a feasibility estimate?

For a single standalone residential dwelling, feasibility estimates start from $900+GST with a typical turnaround time of 3-5 working days.

How accurate are construction feasibility estimates?

Our feasibility estimates follow RICS standards for an 'order of cost' estimate. By using benchmark data from similar NZ construction projects, we ensure that as long as the project scope remains consistent, the initial budget remains a reliable guide for the design phase.

What is a Design Contingency in a QS report?

A Design Contingency is an essential allowance that absorbs costs arising from details released during the documentation lifecycle. It covers coordination gaps between disciplines and minor scope adjustments required during the building consent process.

Can I use a feasibility estimate for bank finance?

Yes. A professional Feasibility Estimate is a critical tool for construction finance. It helps financiers determine borrowing capacity and project viability before you commit significant capital to full architectural documentation and consenting.

What is the cost and turnaround time for a feasibility estimate?

For a single standalone residential dwelling, feasibility estimates start from $900+GST with a typical turnaround time of 3-5 working days.